40A Track Busway system
T40 120V Receptacle-in-Fitter
Specifications
| Phase | Single-Phase |
|---|---|
| Voltage | 120V |
| Amperage | 15A |
| Pole Count | 1 |
| NEMA | 5-15R |
See T40 120V Receptacle-in-Fitter in Action
Watch how this product installs, connects, or configures with the Track Busway system
For additional installation scenarios, configuration examples, and system overviews, visit the Track Busway Video Library →
Interactive 3D Preview
Drag or use arrow keys to rotate. Scroll or pinch to zoom.
This compact T40 receptacle-in-fitter provides a power connection directly at a compatible busway run, with minimal enclosure space at the connection point.
Plan its location around the reach of the equipment cord and the space needed to insert or remove the plug. Coordinate upstream circuit protection with the selected assembly’s ratings.
Build your tap-off
Choose each option below to confirm your tap-off and price, then review the downloads and specifications for your build.
Catalogue number MB-TK50-SBR-B
Couldn't load pickup availability
Documents for your selected tap-off
Product family cut sheets and Revit resources. Check that the document or model covers your selected configuration.
ETL Listed to UL 857 Busway Standards
For 40A Track Busway system models and configurations covered by the listing.
Planning equipment additions along a busway run
Map current equipment and likely future stations before finalizing tap-off positions. Record which loads will operate together and where machines need service access; an available connection position alone does not establish spare electrical capacity.
Keep a schedule of installed tap-off catalogue numbers and the equipment they serve. When a workstation changes, review its supply and connection needs before reusing an existing assembly.
Overhead Power DistributionExplore Applications & Projects →You may also like
- Choosing a selection results in a full page refresh.
- Opens in a new window.