The steel family offers 20A and 40A configurations, with applicable length data sheets specifying a 600V maximum; single-deck lengths have two hot conductors plus neutral, while coordinated double-deck arrangements support three-phase plus neutral and isolated ground where configured. T225 supports three-phase, 50/60Hz configurations up to 225A per phase and 600Vac, with Standard, IG, N2 and N2IG options; use the ratings of the selected compatible components.
Track Busway FAQs – Flexible Overhead Power Distribution
General Questions
Standards & Safety
Advantages vs. Disadvantages
Ordering & Support
What are the lead times for complete T40 and T225 systems?
Typical production lead times to shipment are 3 to 4 weeks for complete T40 systems (40A per feed) including tap-offs and 8 weeks for complete T225 systems (225A per feed) including tap-offs. Confirm the complete bill of materials, required approvals, quoted start date and shipment schedule in your dated quote or order confirmation. Freight transit time is separate. Review complete-system lead times.
What “per feed” means: The 40A and 225A ratings identify the capacity of the selected system’s feed, not a limit on the whole project. Larger layouts can use separately fed sections. Each section and tap-off remains within its own marked rating; T225 busway is rated up to 225A per phase. These lead times cover the complete order, including its specified tap-offs, and are not multiplied by the number of feeds. Confirm the schedule for your order quantity and configuration.
Do these lead times apply to replacement parts?
We keep core modular components in stock for USA TrackBusway replacement and expansion needs. Send your system details or part numbers so our team can match the components and coordinate shipment. Parts orders have their own shipment schedule, separate from complete-system production. Use the replacement-parts support guide.
Replacement and expansion-part support is for USA TrackBusway installations. We do not offer replacement tap-offs for Starline systems.
Can you review a required on-site date?
Send your date, destination, layout or bill of materials, quantities and tap-off requirements so we can confirm the project schedule.